Understanding and managing costs
Estimate credits, compare rates and plan for alternatives before spending.
Estimate credit and money ranges
Use historical credits as a range of examples and convert with a separate, dated or reader-supplied price.
Use recorded credits to judge the scale of past production work. Divide a plan’s price by its included credits to estimate a dollar equivalent.
The middle half of 157 festival productions recorded 470–2,333 credits per finished minute, with a median of 1,207. At the dated US Ultra and Starter credit values, that median represents about USD 52–85 for one minute. Actual spending is unknown.
Plan prices and credit conditions · 24 November 2026
| US plan | Credits/month | USD/month | USD/credit | Billing terms |
|---|---|---|---|---|
| Ultra · recurring monthly | 3,000 | 129 | 0.043 | Recurring price after introductory month |
| Plus · recurring monthly | 1,200 | 59 | 0.04917 | Recurring price after introductory month |
| Starter · monthly | 270 | 19 | 0.07037 | Monthly renewal |
Across 130,704 jobs the projects recorded about 2.48 million credits. The median project total was about 7,800 credits, including three projects with zero recorded credits in the distribution.
Observed 24 November 2026. These are recurring monthly prices for the US. Short introductory discounts and sale prices are excluded. Taxes, local prices and unused credits affect the cost you actually face. Subscription balances generally expire on renewal. Unlimited use is web-only on eligible models and settings. Eligibility can depend on the model, the plan and the duration of a promotion. The estimate uses included credits only.
Higgsfield pricing snapshot source · Credit expiry and renewal
Estimate one deliverable using the middle historical rate, then compare the lower and upper cases.
Plan for candidates and additional footage
Budget for the clips you make while searching for the seconds that end up in the piece.
Allow extra requests for alternative takes, revisions and room to trim. A request specifies a duration. The delivered clip may differ, and the editor may use only a few seconds.
Among the 155 films with complete duration data, the median was 5.4 requested seconds per finished second. The middle half requested about 3–9. Video generation accounted for about 89% of pooled credits across all 157 productions.
For a one-minute piece, compare a plan with three minutes of requests and one with six. Explain which shots justify the added allowance.
Compare the credit implications of tools and settings
Choose a rate for the actual operation, settings and unit you are budgeting.
Price a still per image job and video in the units your tool charges. The Prompter pair shows why it helps to judge both outputs at delivery size before paying for higher resolution.
The Prompter: rerendering at another resolution
Both prompts request a wide view revealing a hotel corridor built as a set inside a soundstage. The requested resolution changes and the framing differs. Use the pair to compare usable compositions and cost, without attributing the framing to resolution.
Notice how the corridor set sits inside the soundstage.
Compare the corridor set and the space visible around it. The recorded size changes, and the framing differs between the images.
Same exact recorded prompt · Same model · Nano Banana Pro · Same 1 attached reference and roles · resolution 2k → 1k · 21:9
Higgsfield’s Seedance 2.5 connector examples price a 10-second clip at 70 credits at 720p, 160 credits at 1080p, 280 credits at 4K (checked 19 November 2026). Historical 1080p-only films had a median of 9 credits per requested second for this model, compared with 16 in the dated connector example. Check the charge and allowance for your actual tool and settings. Connector pricing guide
Historical model averages and resolution groups
The Seedance 2.5 all-settings median uses 144 films with complete durations. Each film’s rate divides recorded model credits by requested seconds. The 1080p-only cohort includes 26 films. Project records do not itemise individual job charges or show paid invoices.
Get a quote for the same operation at two eligible settings. Check the cheaper option against the feature you need to see clearly.
Build a production budget with room to revise
Estimate the whole production either from past projects or from the work you plan to do.
Allow for references, candidates, finishing and a reserve for revisions. Estimate labour, licensing and other software separately. Use the calculator to see where changing the rate or scope leaves you room for another pass.
Compare a production-scope estimate with the historical benchmark. Explain the biggest difference before deciding which allowance to use.